To give you an
idea of our experience here are some completed projects of ours:
1. (ICS) Priory House, Grade 2 listed Building Dudley, Complete design & Re-wire, Value £21’825.00
2. (ICS) The White House, Grade 2 listed building Dudley, Complete design & Re-wire, Value £16’789.00
3. (Hadley Industries) Structural Sections, Steel factory Oldbury, Complete New fire alarm &
Re-wire to two storey office block
& Mains to new factory, Value £52’381.00
4. (Hadley Industries) Roll Form, Steel factory Smethwick, Refurbishment to office area, design & install
Wiring and office partitioning, Value £32’813.00
5. (ICS) Premier Inn, Southampton
Airport, New Air con supplies to every room, Value £30’158.00
6. (ICS) Premier Inn, Southampton
Central, New Air con supplies to every room, Value £61’592.00
7. (ICS) Premier Inn, Putney Bridge-London,
New Air con supplies to every room, Value £58’052.00
8. (Hadley Industries) Steel Factory Smethwick, Complete Re-wire including new 11kv Sub to new premises
(bays 7, 8 & 9) Value £173’257.00
9. (Alpha Manufacturing) Bri-Stor, Factory re-location Stafford, New mains supplies and
Re-wire office block, Value £63’171.00
10. (Alpha Car’s) Relocating offices in Portsmouth into new building, New mains, lighting design, data and
phone systems and Fire alarms. Value £56’692.00
11. (Subway) New store at the NEC in Birmingham including front and rear of
store complete installation of electric supplies and lighting. Value £3787.00
12. (Eastern Oven) New store at the NEC in Birmingham, Indian, Chinese and Italian cuisine. Complete new
install of Lighting and power. Value £11’679.00
13. (West Midlands Police) rewire and various alterations to Bloxwich police station near Walsall.
Mainly Lighting and small power alterations to suit new room layouts, Value £19’194.00
14. (Subway) New store in Chelmsford
Essex, front and rear of shop installations, value £7607.00
15. (Greggs) New store in Headington
(Oxford), complete new rewire for Lighting, Power, Fire alarms and Data.
Value £5400
16. (Subway) Existing store Lighting
overhaul in Taunton, Somerset. Lighting needed upgrading in a current
store to bring it up to the other stores standards. Value £2800
17. (Subway), New store in Newcastle
upon Tyne, Metrocentre, front and rear, value £5423.00
18. (Subway), New Subway Store in
Chaddesden, Derby, front and rear, value £3228.00
19. (Twycross Zoo), Warwickshire,
New lighting design to simulate sunrise/set in Elephant house, Value £2200.
20. (Hadley Structural Engineering) Oldbury, New Automatic heating controls in factory, Value £10’975.00
21. (Browns Restaurant) Worcester centre, complete gutting and revamp of restaurant, value £17692.58
22. (The Woodlodge), Gloucestershire, New offices to an Industrial warehouse, value £24.042.91
23. (Alexandra workwear new offices), Bristol complete building refurbishment, Value £175’000.00
24. (Alfred Dunhill), Bicester Village retail park, complete store refit from scratch, value £12305.00
25.
(Subway), Holbron Hill, Birmingham, complete store
refit from scratch, value £6311.96
26.
(KTC Edibles), Wednesbury plant. Install new RCD
weatherproof sockets for new production line, value £1462.12
27.
(ERI Interiors), Oldbury. Install new power supply for new laser
machine, value £3610.00
28.
(Amethyst Group Logistics), Burton. Test and repair all light
fittings on ground and first floor Mezzanine, value £1586.82
29.
(National Spring), West Bromwich. Install New three phase
supply for Press machine, value £378.74
30.
(Coventry City Council), Install Fire alarm systems to 14 blocks of
flats Bin Stores, value £4820.90
31.
(Through a main contractor) Colmore Gate, Birmingham, Various
floor’s refurbishment works Value £21’455.92
32.
(Through a main contractor) Cheylesmore House,
Coventry, Ongoing refurbishment works in floor
stages, value so far £55'334.00
33. (Through a main contractor) OAK Furniture Land,
Cambridge, New store refit, including power, new
lighting and fire alarms Value £25'000.00
34.
(Through Shopfitting contractor), Waterstones Bookstore, Dorchester,
Strip out and re-install of new lighting, power and data throughout store.
Value £13’423.63
35.
(Through a main contractor) Victoria House, Victoria Square, Birmingham Various floor office refurbishments including new
lighting to match existing, underfloor power systems and new distribution
boards Approx Value £97’000.00
36.
(Through a main
contractor) Unite the Union, Dagenham, Essex, supplying and installing new 3 compartment
Dado trunking into office's to aid moving a company down in an office block,
including sockets and data points, moving telephones and routers and testing. Value £4356.33
37. Wolverhampton College, Wolverhampton. Installing extra three phase circuits into the technology
room with new isolator's and safety lock stop buttons installation to match
existing style. Value £1511.00
38.
(Through a main contractor) Skechers, full Store
refit – Sheffield, Meadowhall. Value £25’600.00
39.
The Tanning Shop, Stafford – New Single and three
phase supplies for tanning machines, small lighting alterations, New distribution
board and a ventilation system, Value - £3418.90
40.
Industrial Steel
plant, Bilston, Wolverhampton. Take down old HID Discharge floodlights
from side of building and replace with new energy efficient 200 watt LED
floodlights controlled by presence detection. Value
£4563.38
41. Walsall
Adult and Community College, Full refurbishment of Reception and Kitchens, including all new LED lighting throughout, rewire of
computer area's in reception and kitchen including single and three phase
supplies. Value £12,704.70
42. (Through
main contractor) Commercial office block, central Worcester, New Lighting including suspended lighting and recessed LED
skytile's, Under floor power and Data trunking, Fire alarm adjustments. Value £25,784.99
43. (Through
main contractor) Lush Store, Telford Shopping centre. Complete rewire installing new lighting supplied by client,
to be installed on sensors and timers, Power and data for counter, Music system
and adjustments to centre connected fire alarm. Value £4959.78
44.
(Through a main contractor) Vodafone store new install, Swindon. Complete
store refit turning the former Jessops store into a brand new Vodafone store in
Swindon town Centre, Approx value £42’000.00
45.
(Through a main contractor) Vodafone, Perry Barr, One Stop shopping centre, Birmingham. ,New store refit Approx value £28’000.00
46.
(Through a main contractor) SK:N Clinic, Complete clinic
Rewire including Power, New LED lighting, Fire alarm adjustments, Epsom,
Surrey Approx value £16’000.00
47.
(Through a main contractor) Barbour, complete Store
Refit, Canary wharf, London. Approx value £10’000.00
48.
(Through a main contractor) Power, new lighting &
Data including 3 compartment skirting trunking in offices, Castle Dermot,
Co. Kildare, Southern Ireland. Approx value £8’000.00
49.
(Through a main contractor) Spar Store – help install
a Subway area into the Spar at Blaenau Ffestiniog, Wales
including rewire, install client provided lighting, and power for all new
appliances, Approx value £4’500.00
50. School
in West Bromwich – Dance studio refit, new mains distribution board, cable
containment, new commercial style lights into a new suspended ceiling, extra
sockets, stripping out of old equipment and cabling - Approx value £4’600.00
51.
School in West Bromwich – Power supply at rear entrance for new
automated barrier system, including the digging up and re-laying of turf and
tarmac across the rear drive, and the supply of armoured cable from one of the
adjacent blocks – Approx value £3400.00
52.
Supply of labour only at Jaguar Landrover, Solihull. Supplying
various quantity teams to provide assistance with building various assembly
lines over approximately a four month period, approximate cost £60’000.00
53.
Monks and Crane Industrial Group – Change every single high
bay lamp in main warehouse, Wednesbury Cost £2300.00
54.
Perryfields High School, Oldbury- 5 year EICR fixed wiring
inspection (Split over two years)
55.
(Through a main contractor) Ford Showroom, Slough. Full re-fit including all
electrics, new internal and external lighting, showroom floor boxes, Data and
telephone points. Approx. value £24’000.00
56.
(Through a main contractor) Ford Showroom, Crayford. Full re-fit including all
electrics and temporary electrics to site cabins, new internal and external
lighting, showroom floor boxes, Data and telephone points. Approx. value £40’000.00
57.
(Through a main contractor) Ford Showroom, Gravesend. Full re-fit including all
electrics, new internal and external lighting, showroom floor boxes, Data and
telephone points. Approx. value £15’000.00
58.
(Through a main contractor) Peacocks store refurbishment. Including
store electrics, till supplies, data, new lighting, P.A system and fire alarms.
Lincoln. Approx. Value £30’000.00
59.
(Through a main contractor) The Mall. Walthamstow. Enabling
works at the Mall, ready for a new TK Maxx store, various enabling and
temporary works and connections. Approx. value £69’000.00
60.
(Through a main contractor) Spar Store, Hagley. Installation
of a Subway store in to the rear of a Spar store, including new lighting and
kitchen power supplies as required, new mains distribution board and a few
alterations to the main store. Approx. value £5000.00
61.
(Through a main contractor) Spar Store, Castle Bromwich. Full
shop re-fit including new lighting, till supplies, various power and data
connections. Approx. value £5’500.00
62.
(Through a main contractor) Sherwood Park, Nottingham, Full
commercial office building refit, top to bottom new supplies, dis boards, floor
boxes and trunking, lighting with auto daylight controls, data, fire alarm - Approx.
value £120’000.00
63.
Hadley Industrial sections Ltd – Install New mains panel
board in factory complete with all new Steel wired armoured cables and cable
trays along the length of the factory, approx. cost £14’000.00
Currently
working on/Coming up:-
- Bottles Wine
Bar – Worcester. New bar fitting out.
- Complete new
Spar store going in, Stoke on Trent.
- On-going at
The Mall, Walthamstow
No comments:
Post a Comment